2.25.2018

Mudhole: Eternal

Ok, I slacked off a bit this week...


Off my game last week as:
  1. We had Monday off
  2. I've been with out a truck most of the week (DEF crap)
  3. Had to take off Friday because the youngest one decided to be sick.
Anyways, we did have a leak or two, and an exceptionally muddy one on Thursday.

Main side, lateral leak. Domestic.

What started as a small leak, turned into a giant mud hole. Normally, when you have two services (meters) next to each other, the end up tying in together at a "Tee". Then that tee feeds into the main. If you go back on some of the posts I have had about leaks, you can see this.

Well, we expected this as well with this leak, but... this was not the case.

Strike First. Strike Hard. No Mercy

It turned soupy, quick.

When digging down on an active leak, it can get a little hard to see what you are doing. Most initial guesses as to what is broken is done with the hands, and not the eyes. This is why we were confused when it felt like a 3/4 inch line was feeding from the main. Normal, as mentioned above, there would be a tee. Tee's are always going to be a larger diameter that the lines that feed off of them (what we call the service). So it made no sense to have a 3/4 line feeding off the main, splitting into two 3/4 services. That would cause a volume issue for the two customers on that lateral line, should they both try to use water at the same time.

ANYWAYS.

We dug on.

Trying to keep the water off us long enough to figure out what is going on.

Is the lateral over here?

Or is it over here

The hole got wetter, deeper and wider as we went. Eventually we uncovered the right service and verified that it was indeed a single service tied directly into the main, with no tee. This would mean the other service would be the same.

The single tap off the main

The service was broke right at the main. She let go once we started missing with it.


After a new service was built and screwed into the main, we could stop the water flow, and build back. I always take this time to look at what broke, and why.

This weird metal/pvc female adapter broke. Over tightened more than likely on install.

Rebuilding each service in poly. 

Ground was still muddy as could be.

Very muddy. A few boots were lost

Made sure the lines were flushed, and and backfilled what we could.

Still wet!

What. A. Mess.

Then on to the most important part of the day. Lunch.



Well, that all for now.
I go oncall this next week, from Monday to Monday. It's my first time as an on call leader, so I'm sure that will be fun and bring it's own challenges. (I hate being oncall by the way.)

Here's to the next time!