2.07.2018

More Mud Holes?

Couple more leaks passed by our way this week. Let me show you their features.


This first one was relatively small. A backflow company was attempting to change out a backflow, and in the process split a piece of galvanized pipe.  We had to cut back on it with a hacksaw, and install a new compression fitting with curbstop. We always try to fix our leaks under pressure, especially the small ones. Fixing the leaks under pressure prevents disruption of service to the customer, as well as prevents us from putting customers under a "Boil Water" notice.
Split right behind the curbstop in the galvanized pipe.

 

Next one was a doozy

 

 
 This leak came in at 4:30pm. Sometimes we let them ride till the next day, but in the case of leaks like this one, we decided to fix it immediately. The water main runs directly underneath the driveway, about where the split is between the dry and wet pavement. Trucks were loaded with dirt and limestone, trackhoe was loaded up, and off we went.
 

 
 
Driveway was cut to gain access to the ground and water main underneath. Once we got down to the main, the leak indeed up being a 5 inch split running inline with the pipe. Looked like the pipe had suffered a hit when it was originally installed, and just wore out over time. 



Strike first, strike hard. No mercy.





Ended up staying till 12am





 
 
The split section was cut out and replaced. Sometimes we can install a repair band around the main, but the position of the crack made prepping the pipe too difficult. Before wrapping a pipe, the ideal way to handle a split is to drill a hole at the edge of the split line, to prevent the crack from spreading. The split on this pipe was on the bottom, so we would have to submerge our drill in the water and mud to drill the pipe.
 
After the main was repaired, the hole was backfilled, and water service restored. Didn't get to keep the water on this time. Total repair took around 6-7 hours. Not that bad, but we could have shaved an hour off if we went straight to the clamps and replacing the piece of affected pipe.
 
A repair band was attempted first

Two hymax couplings were used, as well as a new piece of pipe.

Driveway secured.

Bye Felicia.